Vance Gap Slide Repair

Heavy rains that occurred in April of 2021 caused a landslide on the east side of Vance Gap Road near the Trailridge Road intersection. City of Asheville Streets Division operations crews conducted repairs to stabilize the slide and the City issued a Request for Qualifications for a design firm to design permanent repairs for the slide and to also perform a general stability analysis for the rest of the road.