Funding from the bond referendum passed in 2016 was used to renovate and replace playgrounds at Herb Watts Park in Southside (Park District: South Central), Leah Chiles Park in Kenilworth (Park District: East Central), and the Augusta Barnett Playground in West Asheville (Park District: West).
The City of Asheville Parks & Recreation Department is making improvements to Triangle Park in downtown. The project includes re-sodding grassed areas, installation of an irrigation system throughout the sod areas, mulching under trees and other areas where grass isn’t feasible, limbing and pruning trees for better visibility and replacing the park furnishings such as trash/recycling cans, benches and picnic tables.
Outdoor sport court replacements with enhanced features such as new retaining walls, new fencing, new lighting, and improved ADA accessibility were completed at Murphy-Oakley Park (Park District: Southeast), Malvern Hills Park (Park District: West) and Montford Park (Park District: West Central).
Splasheville, the very popular interactive splash pad located in Pack Square Park went under a major renovation beginning in spring, 2021 including replacing the controls, wiring and plumbing and repairing or replacing many of the surface tiles and their supporting gridwork.
Construction is complete on a new community picnic shelter and restroom facility at Richmond Hill Park. Key features of this project include a covered picnic shelter, winterized restrooms, an updated water fountain with bottle fillers and a pet dish, a new disc golf tee box at hole one, an expanded green space, and new walkways connecting park features.
It is anticipated that the project will include a new entry sidewalk, new play equipment and surfacing, repaving the walking path, new park lighting, removal of the bathroom building, refreshed landscaping, improved ADA accessibility and fencing improvements.
The City has identified needed improvements to the Asheville Skate Park located at 50 Cherry Street. These projects include the development of an entry skate plaza, restoration of the amphitheater seating and fencing, and engaging with local artists to enhance the park and re-brand the park through street art.
A drop-by event to review the scope of the project will be held at the park on Saturday, December 4, 3-5 p.m. Fun activities will be available for children who attend!