This project involved grading and removal of sediment from the site to improve flood capacity near Azalea Road and John B. Lewis Soccer Fields. Work included erosion control, grading, removal of sediment, and reseeding to establish ground cover.
Geographic Area: East
A Public Works Stormwater Operations team replaced failing pipes that ran underneath Kenilworth Road near its intersection with Rosefield Drive with a new larger pipe. This work was particularly challenging because of all the underground utilities surrounding the pipe. The headwalls were also replaced and the creek banks stabilized in this area as part of this work.
Project construction began in the fall of 2021 with substantial completion this winter 2021.
The City of Asheville’s Transportation Bond project will be engineering and constructing a section of the Swannanoa River Greenway.
The purpose of the project was to develop a comprehensive, multi-disciplinary master plan intended to celebrate the literary accomplishments of Thomas Wolfe, better integrate the site into the Asheville park system and guide the restoration or rehabilitation of the cabin.
After more than two years of construction, the North Fork Dam Improvement Project is complete! This gives our community a safer dam with more capacity to hold water from the reservoir and one that is better enforced against potential seismic activity.
The City of Asheville Parks & Recreation Department has contracted with Wildlands Engineering, Inc. to complete an assessment and provide preliminary design information of improvements to ensure the long term integrity of the pond, enhance public safety and explore recreational and ecological opportunities that may be compatible with proposed improvements.
The goal of this project will be to evaluate the existing stormwater system in order to develop engineered stormwater solutions and associated cost estimates to improve conditions throughout the Asheville Municipal Golf Course.