Water Line Review

In This Section

    The Water Resources Department is a delegated authority (requires Adobe Reader) by the North Carolina Department of Environment and Natural Resources (NCDENR) to review and approve water system extension plans within the City of Asheville Water Resources Department's service area. The department reviews water line plans when a development requires at least one of the following:

    • A water main extension
    • Fire protection (sprinkler system)

    Preliminary Plan Review

    After the Water Availability Request process and the Letter of Commitment has been issued, a professional civil engineer is required to design the water line by using the guidelines in Section 6, Water Distribution of the Standard Details and Specifications manual. Once completed, the engineer will submit the following for preliminary plan review:

    Once the submittal is received by the City of Asheville, staff will thoroughly review it to ensure the design meets the city's criteria. If needed, staff will send the engineer a review comment letter listing items that need to be revised to meet the criteria. If a re-submittal is not required, the engineer will be sent an approval notification and a request to submit final plan for review.

    Final Plan Review

    The following is required for final plan submittal:

    • 5 Sets of Final Plans (Revised if required)
    • Final Application for Approval of Engineering Plans and Specifications For Water Supply Systems Form (Revised if required)
    • 1 Final Addendum to Engineer's Report
    • NCDOT Encroachment Application Package other Permits (if applicable)

    Once the final plan submittal is received, reviewed, and approved, a letter will be sent notifying the engineer of the authorization to construct, along with a summary of the approved project and a copy of the approved plans and application form. The letter will also request that the engineer schedule a preconstruction meeting with city staff.

    Preconstruction Meeting

    The purpose of the preconstruction meeting is to discuss with engineer and contractor the scope of the project, its construction, inspection, testing and the close-out procedure. During the meeting, the engineer will be presented with the NCDENR Public Water System Authorization to Construct certificate. Please go to the Water Line Inspections page for information about the construction, inspection, testing and the close-out procedure.

    Preconstruction Scheduling Contact Information:

    Water Resources Department
    Secretary Senior: Gloria Smith
    Water Engineering
    P. O. Box 7148, Asheville, NC 28802
    7:30 a.m.-5:00 p.m., Monday-Thursday (828) 259-5403
    gsmith@ashevillenc.gov

    Adobe Acrobat Reader is required to view the following documents:

    Appendix A4
    Appendix A5
    Application for Approval of Engineering Plans and Specifications For Water Supply Systems Form
    Addendum to Engineer's Report
    Sprinkler System Certification

    Send submittals by mail to:
    City of Asheville
    Water Resources Department
    ATTN: Gloria Smith
    P.O. Box 7148
    Asheville, NC 28802
    Phone 1: (828) 259-5403
    Phone 2: (828) 259-5955

    Submittals by delivery:
    Water Engineering /Water Resources
    Development Services Center
    Public Works Building
    161 South Charlotte Street
    Asheville, NC 28801

    Water Line Plan Review Contacts:

    Water Resources Department
    ATTN: Engineering Services Manager, Chad Pierce, PE
    P. O. Box 7148
    Asheville, NC 28802
    7:30 a.m.-5:30 p.m., Monday-Thursday
    (828) 259-5420
    cpierce@ashevillenc.gov

    Water Resources Department
    Water Engineering
    P. O. Box 7148
    Asheville, NC 28802
    7:30 a.m.-5:30 p.m., Monday-Thursday

    ATTN: Senior Project Engineer, Sonia Salgado, PE
    (828) 259-5534
    ssalgado@ashevillenc.gov

    ATTN: Project Engineer, Mark Letterman
    (828) 232-4589
    mletterman@ashevillenc.gov

    Stay Connected